St. Joe’s Parking Garage

  • Selective Demolition
  • Work began in January of 2018 and was completed in December 2018. These dates include phased work
  • Demolition and removal of 3 story concrete casts, concrete stairwell on exterior, concrete spandrels, retaining walls, and footings 20 ft below grade at the St. Joe’s Hospital Parking Garage
  • This specific project involved the removal of large sections of precast concrete, as well as the removal of footings that required a mini excavator to be lowered into a 20ft below grade opening. The coordination of events during demolition had to be planned and done in a manner not interrupt any of the ongoing hospital operations, maintain the scheduling requirements of the general contractor, and ensure a safe jobsite for workers as well as the public.