Metro Lofts
Completed in May 2022
Demolition and removal of a 100,000 SF stripmall building complete including the concrete slab and footings. All concrete sidewalks, pathways, asphalt, curbing and slabs within the demo area were removed as well.
Completed in May 2022
Demolition and removal of a 100,000 SF stripmall building complete including the concrete slab and footings. All concrete sidewalks, pathways, asphalt, curbing and slabs within the demo area were removed as well.