520 W Van Buren

  • Full Site Demolition 
  • August 2018 to September 2018
  • Demolition and removal of a fire damaged building down to concrete slab as RACM. Clean up and haul off of fire debris from throughout the lot 
  • The material being hauled off on this project was treated as RACM (Regulated Asbestos-Containing Material), so extra safety measures had to be put in place for all handling the material. Trucks that were hauling material were lined with poly and wrapped. Each load was taken to a landfill that accepted RACM. All EPA regulations and guidelines were followed. 