1275 W. Washington

  • Full Site Demolition 
  • April 2019 to July 2019
  • Demolition of the 112,985SF two story Attorney General’s building in Downtown Phoenix complete including the concrete slab, footings and caissons. Once caissons where removed the holes where backed filled and compacted to 95% compaction.
  • The concrete slabs and footings where recycled totaling 6,000 tons of material.
  • There was 720,000 LBS of metal recycled. 

Leave a Reply